AISCAISC 360-22
TablesN Quality control and quality assurance

Table N5.4-2: Inspection Tasks During Welding

PDF page 256 · AISC 360-22

Inspection Tasks During WeldingQCQA
Control and handling of welding consumables • Packaging • Exposure control OO
No welding over cracked tack weldsOO
Environmental conditions • Wind speed within limits • Precipitation and temperature OO
WPS followed • Settings on welding equipment • Travel speed • Selected welding materials • Shielding gas type/flow rate • Preheat applied • Interpass temperature maintained (min./max.) • Proper position (F, V, H, OH) OO
Welding techniques • Interpass and final cleaning • Each pass within profile limitations • Each pass meets quality requirements OO
Placement and installation of steel headed stud anchorsPP

User Note: The technique, workmanship, appearance, and quality of welded construction are addressed in Section M2.4.

As a minimum, welding inspection tasks shall be in accordance with Tables N5.4-1, N5.4-2, and N5.4-3. In these tables, the inspection tasks are as follows:

  • (a) Observe (O): The inspector shall observe these items on a random basis. Operations need not be delayed pending these inspections.
  • (b) Perform (P): These tasks shall be performed for each welded joint or member.