Table N5.6-1: Inspection Tasks Prior to Bolting

PDF page 259 · AISC 360-22

Inspection Tasks Prior to BoltingQCQA
Manufacturer’s certifications available for fastener materialsOP
Fasteners marked in accordance with ASTM requirementsOO
Correct fasteners selected for the joint detail (grade, type, bolt length if threads are to be excluded from shear plane)OO
Correct bolting procedure selected for joint detailOO
Connecting elements, including the appropriate faying surface condition and hole preparation, if specified, meet applicable requirementsOO
Pre-installation verification testing by installation personnel observed and documented for fastener assemblies and methods usedPO
Protected storage provided for bolts, nuts, washers, and other fastener componentsOO
  • (a) For snug-tight joints, pre-installation verification testing as specified in Table N5.6-1 and monitoring of the installation procedures as specified in Table N5.6-2 are not applicable. The QCI and QAI need not be present during the installation of fasteners in snug-tight joints.
  • (b) For pretensioned joints and slip-critical joints, when the installer is using the turn-of-nut or combined method with matchmarking techniques, the direct-tension-indicator method, or the twist-off-type tension control bolt method, monitoring of bolt pretensioning procedures shall be as specified in Table N5.6-2. The QCI and QAI need not be present during the installation of fasteners when these methods are used by the installer.
  • (c) For pretensioned joints and slip-critical joints, when the installer is using the turn-of-nut or combined method without matchmarking, or the calibrated wrench method, monitoring of bolt pretensioning procedures shall be as specified in Table N5.6-2. The QCI and QAI shall be engaged in their assigned inspec- tion duties during installation of fasteners when these methods are used by the installer.

As a minimum, bolting inspection tasks shall be in accordance with Tables N5.6-1, N5.6-2, and N5.6-3. In these tables, the inspection tasks are as follows:

  • (a) Observe (O): The inspector shall observe these items on a random basis. Operations need not be delayed pending these inspections.
  • (b) Perform (P): These tasks shall be performed for each bolted connection.