Table N5.6-2: Inspection Tasks During Bolting

PDF page 260 · AISC 360-22

Inspection Tasks During BoltingQCQA
Fastener assemblies placed in all holes, and washers and nuts are positioned as requiredOO
Joint brought to the snug-tight condition prior to the pretensioning operationOO
Fastener component not turned by the wrench prevented from rotatingOO
Fasteners are pretensioned in accordance with the RCSC Specification, progressing systematically from the most rigid point toward the free edgesOO

TABLE N5.6-3 Inspection Tasks After Bolting Inspection Tasks After Bolting | Inspection Tasks After

Figure description:

TABLE N5.6-3 Inspection Tasks After Bolting

Inspection Tasks After Bolting

Inspection Tasks After BoltingQCQA
Document acceptance or rejection of bolted connectionsPP