TablesN Quality control and quality assurance
Table N5.4-3: Inspection Tasks After Welding
PDF page 257 · AISC 360-22
| Inspection Tasks After Welding | QC | QA |
|---|---|---|
| Welds cleaned | O | O |
| Size, length, and location of welds | P | P |
| Welds meet visual acceptance criteria • Crack prohibition • Weld/base-metal fusion • Crater cross section • Weld profiles • Weld size • Undercut • Porosity | P | P |
| Arc strikes | P | P |
| k-area[a] | P | P |
| Weld access holes in rolled heavy shapes and built-up heavy shapes[b] | P | P |
| Backing removed and weld tabs removed (if required) | P | P |
| Repair activities | P | P |
| Document acceptance or rejection of welded joint or member[c] | P | P |
| No prohibited welds have been added without the approval of the engineer of record | O | O |
[a]When welding of doubler plates, continuity plates, or stiffeners has been performed in the k-area, visually inspect the web k-area for cracks within 3 in. (75 mm) of the weld.